NVIDIA expands Australia AI capacity with 8 partners
NVIDIA announced on Sept. 9 that it is working with eight Australian infrastructure providers on an AI factory buildout targeting up to two gigawatts of capacity by 2027.
- NVIDIA and eight Australian partners plan up to two gigawatts of AI capacity by 2027.
- Australian providers will operate the AI factories while NVIDIA supplies computing, networking, software and support.
- Sharon AI plans to deploy up to 68,000 NVIDIA GPUs using DSX infrastructure in Australia.
- IREN's planned Bundey campus in South Australia is designed for 800 megawatts of capacity overall.
- Australia currently has 1.6 gigawatts of computing capacity, according to published Data Centres Australia estimates.
The planned expansion involves Firmus, Sharon AI, IREN, Megaport, ResetData, CDC, NEXTDC and AirTrunk. According to NVIDIA's official announcement, the partners will develop land, power and powered-shell capacity capable of hosting multiple generations of NVIDIA DSX infrastructure.
NVIDIA will provide accelerated computing systems, networking equipment, software and technical support. The participating companies will operate the facilities. That structure means the two-gigawatt figure represents a collective capacity target, rather than a single NVIDIA-owned data center.
The proposed buildout would be larger than Australia's existing data center computing capacity. Australia currently has about 1.6 gigawatts, according to Data Centres Australia and market researcher DC Byte, figures cited by Reuters.
Eight partners will divide infrastructure responsibilities
Sharon AI plans to deploy up to 68,000 NVIDIA GPUs connected through NVIDIA Quantum InfiniBand and Spectrum-X Ethernet networking. The company said the systems would serve Australian startups, enterprises, government agencies and research organizations requiring locally hosted computing capacity.
IREN will combine NVIDIA's DSX reference architecture with its experience in power, land, data centers and GPU operations. Its contribution includes the planned 800-megawatt Bundey campus in South Australia. IREN has historically operated Bitcoin mining infrastructure but has increasingly expanded into AI cloud services and high-performance computing.
That shift reflects a wider overlap between cryptocurrency mining and AI infrastructure. Both businesses require access to large power supplies, cooling systems and computing facilities. In related coverage, crypto.news examined why AI chips are increasingly being compared with scarce digital assets as demand for computing capacity grows.
CDC said it operates more than 550 megawatts across Australia and New Zealand, with another 800 megawatts under construction. The company also claims its facilities use renewable electricity and zero-water cooling systems. Those environmental statements are company claims and have not been independently verified across every proposed site.
NVIDIA DSX connects facilities with AI software
NVIDIA describes DSX as a full-stack AI factory platform covering facility design, computing, networking, software and reference architecture. The system is compatible with CUDA and is designed to support later generations of NVIDIA hardware without requiring operators to redesign every infrastructure layer.
The company said expanded capacity would give Australian organizations greater access to NVIDIA Nemotron open models. Healthcare technology company Heidi is using Nemotron tools for clinical applications, while Atlassian is applying NVIDIA technology to semantic search and other features within its Rovo AI platform.
However, NVIDIA did not disclose the expected cost of the Australian buildout, individual investment commitments or how much of the targeted capacity already has financing, planning approval or grid connections. The two-gigawatt target should therefore be treated as a forward-looking plan rather than completed infrastructure.
Power access will determine whether the target is reached
The scale of the proposal brings power availability, grid connections and cooling requirements into focus. Data centers consume electricity continuously, and high-density GPU clusters can require more advanced cooling than conventional computing facilities.
NVIDIA said additional capacity could support new power-generation projects, but it did not identify specific generation assets or electricity contracts. Australian authorities and infrastructure operators will need to assess network connections, construction approvals and local environmental requirements for individual projects.
NEXTDC separately announced plans to raise A$1.1 billion through convertible notes to support its expanding AI infrastructure portfolio, Reuters reported. The financing is broader than the NVIDIA collaboration and should not be treated as funding solely for DSX facilities.
The next measurable developments will be site approvals, power agreements, construction milestones and GPU delivery schedules. NVIDIA and its partners have not published a shared timetable showing how much capacity should become operational during each stage before 2027.
NVIDIA also cautioned that its infrastructure projections remain subject to demand, partner execution, regulation and technology availability. Investors can monitor those risks through the company's SEC filings, alongside future announcements from the eight Australian partners.
This content is provided for general informational purposes only and doesn't constitute financial, investment, legal, or tax advice. Any events, rewards, online promotions, or related information mentioned herein should not be considered a recommendation, solicitation, or invitation to purchase, sell, trade, or otherwise deal in any crypto assets. Crypto assets are highly volatile and may result in loss. The availability of WEEX services, products, and related events may vary by region. You are responsible for ensuring that your participation is in accordance with applicable local laws and regulations.
You may also like

Unicoin takes Uniswap to court over UNI trademark dispute

BCE, PPI: The Two Events Shaping Inflation

VerifiedX launches $15M Bitcoin funding round

WEEX Auto Earn: Turn Idle Crypto Into Daily Passive Income, No Lock-Up Required
WEEX, a global multi-asset trading platform, has announced the launch of WEEX Auto Earn, a new passive-income feature that allows standard users to earn up to 100% APR (7-day exclusive for new users) on idle USDT held across their funding, futures, and spot accounts.

The Era of AI Spending Money... Will Stablecoins Become the Payment Network for the 'Agent Economy'?

How to Join the 4STOCK Airdrop and Share 50,000 USDT on WEEX

UBS Says 'Gold Prices Have Fully Priced in the Fed'

Japan’s 3% bond yield challenges U.S. Treasuries

What is hedging? The trading minute

What is Beldex (BDX)? Why are over 2 billion unlisted?

Fidelity brings FIDD stablecoin to on-chain finance

Cypher Asia 2026 Hong Kong Summit Concludes Successfully: 22 Industry Leaders Discuss the New Future of Intelligent Crypto Finance

Tether: Bitcoin, or Dollars, the Empire Built by Paolo Ardoino

What is Starknet? Reasons for the Supply Cap of 10 Billion in Published Information

What is dogwifhat (WIF)? An Explanation of Wallet Numbers and Holder Statistics

Oil Back Above $100 | WEEX TradFi Daily (September 10, 2026)
On September 10, markets digested Apple’s product event and the oil breakout. Apple (AAPL) launched its first foldable iPhone Duo at $1,999, while the iPhone 18 Pro price rose by $100 to start at $1,199. The stock closed down about 0.3% at $315.34 on September 9 ET. Brent crude moved back above $100, all three major U.S. indexes closed lower, and energy was the only sector to post a gain of about 1.1%. Bitcoin remained capped by renewed hike pricing. Investors are now waiting for Adobe (ADBE) and Oracle (ORCL) earnings after the close on September 10 ET.

Korean National Assembly Budget Office: Korean Won Stablecoin Expected to Save Up to $3.8 Billion in Settlement Fees Annually

'Barotune' Provides AI Interpretation at CMAAO Seoul Conference with Real-Time Subtitles for Technical Terms

Ethereum to Allow Gas Fee Payments Without Holding ETH, Considered for 2027 Upgrade

Bankless Latest Podcast: How to Find Undervalued Tokens from VVV to Hyperliquid?

Is the Current Pullback a Buying Opportunity as Long as We Are Not in a Rate Hike Cycle?

Philippine Central Bank to Suspend New Registrations for Payment Service Providers for 12 Months, Considering Enhanced Supervision of VASPs

Fixed Term: Which Bank Offers the Most for Investing $500,000

Banks Accelerate for Labor Assistance Funds: Offering Strong Benefits to Attract Compensation Funds

From NYU Teaching Assistant to White House Spotlight: Chainlink Founder Took No Shortcuts

The Little-Known European Destination Where You Can Save Over $20,000 in 10 Months

OpenAI just showed why one of its former researchers thinks AI could kill everyone

AI Detects Bottlenecks That Could Accelerate Linux Builds by Up to 70%

Semaglutide Prolonged the Lifespan of Aged Female Mice by 12%, According to a Study

Computer failure in UK air traffic affects over 2,000 flights
Unicoin takes Uniswap to court over UNI trademark dispute
BCE, PPI: The Two Events Shaping Inflation
VerifiedX launches $15M Bitcoin funding round
WEEX Auto Earn: Turn Idle Crypto Into Daily Passive Income, No Lock-Up Required
WEEX, a global multi-asset trading platform, has announced the launch of WEEX Auto Earn, a new passive-income feature that allows standard users to earn up to 100% APR (7-day exclusive for new users) on idle USDT held across their funding, futures, and spot accounts.



